CR Mega Block on 25th December 2022

0

CR Mega Block on 25th December 2022

Central Railway, CR Mumbai Division will operate Mega Block on its suburban sections for carrying out various engineering and maintenance works on 25th December 2022

Chhatrapati Shivaji Maharaj Terminus-Vidyavihar Up and Dn slow lines from 10.55 am to 03.55 pm

Dn slow services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.48 am to 3.49 pm will be diverted on Dn fast line between Chhatrapati Shivaji Maharaj Terminus Mumbai and Vidyavihar stations halting at Byculla, Parel, Dadar, Matunga, Sion and Kurla stations and further re-diverted on proper Dn slow line.

Up slow services leaving Ghatkopar from 10.41 am to 3.52 pm will be diverted on Up fast line between Vidyavihar and Chhatrapati Shivaji Maharaj Terminus Mumbai halting at Kurla, Sion, Matunga, Dadar, Parel and Byculla Stations.

Vadala Road-Mankhurd Up and Dn harbour lines from 11.00 am to 4.00 pm
(CSMT – Bandra/Goregaon services not affected)

Up Harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/ Belapur/Vashi from 9.40 am to 3.28 pm and Dn Harbour line services to Panvel/Belapur/Vashi leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.03 am to 3.54 pm will remain cancelled.

Suburban train services between CSMT and Bandra/Goregaon will run as per schedule during the block period.

Harbour line passengers are permitted to travel via Transharbour / Main line from 10.00 am to 4.30 pm

Special suburban trains will run on the Panvel-Mankhurd section during the block period.
Passengers are requested to bear with the Railway Administration for the inconvenience caused.

These maintenance mega blocks are essential for infrastructure upkeep and safety.

About Author

error: Content is protected !!

Maintain by Designwell Infotech