CR Mega Block on 10.7.2022

0

Mumbai: CR Mega Block on 10.7.2022. CR Central Railway, Mumbai Division will operate Mega Block on its suburban sections for carrying out various engineering and maintenance works on 10.7.2022 as under:

Matunga-Mulund Up and Dn Slow lines from 11.05 am to 4.05 pm

Dn slow line services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.14 am to 3.32 pm will be diverted on Dn fast line between Matunga and Mulund stations halting at Sion, Kurla, Ghatkopar, Vikhroli, Bhandup and Mulund further rediverted on Dn slow line from Mulund and will arrive destination 15 minutes behind schedule.

Up Slow line services leaving Thane from 10.58 am to 3.59 pm will be diverted on Up fast line between Mulund and Matunga halting at Mulund, Bhandup, Vikhroli, Ghatkopar, Kurla and Sion, further rediverted on Up slow line at matunga and will arrive destination 15 minutes behind schedule.

Panvel- Vashi Up and Dn harbour lines from 11.05 am to 4.05 pm
(Excluding Belapur/Nerul-Kharkopar line)

Up Harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel from 10.33 am to 3.49 pm and Dn Harbour line services to Panvel/Belapur leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 9.45 am to 3.12 pm will remain suspended.

Up Transharbour line services towards Thane leaving Panvel from 11.02 am to 3.53 pm and Dn Transharbour line services towards Panvel leaving Thane from 10.01 am to 3.20 pm will remain suspended.

Special local trains will run on Chhatrapati Shivaji Maharaj Terminus Mumbai – Vashi section during the block period.

Transharbour line services will be available between Thane-Vashi/Nerul stations during the block period.

Belapur/Nerul-Kharkopar line services will be available during block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

About Author

error: Content is protected !!

Maintain by Designwell Infotech