Central Railway Mega Block on 19.03.2023

0

Mumbai: Central Railway, Mumbai Division will operate Mega Block on its suburban section for carrying out various engineering and maintenance works on 19.03.2023. The details are as under:

Chhatrapati Shivaji Maharaj Terminus-Vidyavihar Up and Dn slow lines from 10.55 am to 03.55 pm

Dn slow line services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.48 am to 3.40 pm will be diverted on Dn fast line between Chhatrapati Shivaji Maharaj Terminus Mumbai and Vidyavihar stations halting at Byculla, Parel, Dadar, Matunga, Sion, and Kurla stations and further re-diverted on proper Dn slow line.

Up slow line services leaving Ghatkopar from 10.41 am to 3.52 pm will be diverted on Up fast line between Vidyavihar and Chhatrapati Shivaji Maharaj Terminus Mumbai halting at Kurla, Sion, Matunga, Dadar, Parel and Byculla Stations.

No Mega Block will be operated on Harbour Line between Chhatrapati Shivaji Maharaj Terminus Mumbai and Panvel.

This maintenance mega block is essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

About Author

error: Content is protected !!

Maintain by Designwell Infotech