72 hour Infrastructure Block on Thane-Diva Fast line for 5th and 6th line work

0

Mumbai: Infrastructure Block of 72 hours on Thane-Diva Fast line for 5th and 6th line work. Central Railway will operate a special infrastructure block between Thane and Diva for cut & connection works and commissioning of new RRI building in Diva in connection with Thane-Diva 5th and 6th lines, during the Infrastructure Block of 72 hours ,The block will be operated as under –

Trains will run on Slow line

On Existing 5th line and 6th line between Thane and Diva from 00.00 hrs of 5.2.2022 to (Friday/Saturday midnight 12 am) to 00.00 hrs of 7.2.2022 (Monday/Tuesday midnight 12 am) 72 hours.
On Existing Up fast line from 00.00 hrs (midnight 12 am) of 5.2.2022 to 04.00 am of 6.2.2022 (28 hrs)

Due to this the working of Mail/Express and Suburban trains during the block period will be as under:

• Up Mail/Express and Up fast suburban trains leaving Kalyan from 23.10 hrs (11.10 pm) of 4.2.2022 to 04.00 hrs (4.00 am) of 6.2.2022 will be diverted on Up slow line between Kalyan and Mulund and will not halt at Thane station.
•       From 6.2.2022 Up fast trains will run on newly laid Up fast line via Kalva platform No.4 and New tunnel-1
• Dn Mail/Express trains leaving LTT and arriving at Thane from 23.10 hrs (11.10 pm) of 4.2.2022 to till completion of block will be diverted on Down fast line between Mulund and Kalyan station via Thane Platform No.5
• Up and Down slow line suburban services will run via newly laid Up and Down slow lines i.e. Thane – Kalva – Mumbra – Diva on proper route
• During the block period MEMU services between Vasai Road /Panvel /Roha will run on a special timetable given below (Regular Timetable for Central Railway MEMU services will remain cancelled except Western Railway MEMU services)
• Down fast suburban services will run on newly laid Dn fast line via New Platform No.3 of Kalva station, Mumbra platform No.3 and Diva proper platform No.3
• Existing Down and Up fast lines between Thane – Diva via Parsik tunnel will be commissioned as 5th and 6th lines
• On 5.2.2022 about 175 timetabled suburban trains will remain cancelled, however few suburban trains will run as specials.

Cancellation of Mail / Express trains
22119/22120 Mumbai – Karmali – Mumbai Express JCO 5.2.2022 & 6.2.2022
12051/12052 Mumbai – Madgaon – Mumbai Janshatabdi Express JCO 5.2.2022, 6.2.2022 & 7.2.2022
11085 Lokmanya Tilak Terminus – Madgaon Express JCO 7.2.2022
11086 Madgaon – Lokmanya Tilak Terminus Express JCO 8.2.2022
11099 Lokmanya Tilak Terminus – Madgaon Express JCO 5.2.2022
11100 Madgaon – Lokmanya Tilak Terminus Express JCO 6.2.2022
22113 Lokmanya Tilak Terminus – Kochuveli Express JCO 5.2.2022
22114 Kochuveli – Lokmanya Tilak Terminus Express JCO 7.2.2022
12224 Ernakulam – Lokmanya Tilak Terminus Express JCO 2.2.2022 & 6.2.2022
12223 Lokmanya Tilak Terminus – Ernakulam Express JCO 5.2.2022 & 8.2.2022
12220 Secunderabad – Lokmanya Tilak Terminus Express JCO 4.2.2022
12219 Lokmanya Tilak Terminus – Secunderabad Express JCO 5.2.2022
12133/ 12134 Mumbai – Mangluru Jn.- Mumbai Express JCO 4.2.2022, 5.2.2022, 6.2.2022 & 7.2.2022
17317 Hubballi – Dadar Express JCO 4.2.2022, 5.2.2022 & 6.2.2022
17318 Dadar- Hubballi Express JCO 5.2.2022, 6.2.2022 & 7.2.2022
11008 Pune – Mumbai Deccan Express JCO 4.2.2022, 5.2.2022, 6.2.2022 & 7.2.2022
11007 Mumbai-Pune Deccan Express JCO 5.2.2022, 6.2.2022, 7.2.2022 & 8.2.2022
11030 Kolhapur – Mumbai Koyna Express JCO 4.2.2022, 5.2.2022 & 6.2.2022
11029 Mumbai – Kolhapur Koyna Express JCO 5.2.2022, 6.2.2022 & 7.2.2022
12071 / 12072 Mumbai–Jalna-Mumbai Jan Shatabdi Express JCO 5.2.2022 & 6.2.2022
12109/12110 Mumbai-Manmad–Mumbai Panchvati Express JCO 5.2.2022 & 6.2.2022
11401/11402 Mumbai – Adilabad-Mumbai Nandigram Express JCO 4.2.2022, 5.2.2022 & 6.2.2022
12123/12124 Mumbai – Pune – Mumbai Deccan Queen Express JCO 5.2.2022, 6.2.2022 & 7.2.2022
12112 Amravati – Mumbai Superfast Express JCO 4.2.2022 & 5.2.2022
12111 Mumbai – Amravati Superfast Express JCO 5.2.2022 & 6.2.2022
12140 Nagpur – Mumbai Sewagram Express JCO 4.2.2022 & 5.2.2022
12139 Mumbai – Nagpur Sewagram Express JCO 5.2.2022 & 6.2.2022
11139/11140 Mumbai-Gadag – Mumbai Express JCO 4.2.2022, 5.2.2022 & 6.2.2022
17611 H.S.Nanded – Mumbai Rajyarani Express JCO 4.2.2022 & 5.2.2022
17612 Mumbai – H.S.Nanded Rajyarani Express JCO 5.2.2022 & 6.2.2022
12131 Dadar- Sainagar Shirdi Express JCO 5.2.2022
12132 Sainagar Shirdi – Dadar Express JCO 6.2.2022
11041 Dadar- Sainagar Shirdi Express JCO 3.2.2022 & 5.2.2022
11042 Sainagar Shirdi – Dadar Express JCO 4.2.2022 & 6.2.2022
11027 Dadar- Pandharpur Express JCO 4.2.2022
11028 Pandharpur – Dadar Express JCO 5.2.2022
22147 Dadar- Sainagar Shirdi Express JCO 4.2.2022
22148 Sainagar Shirdi – Dadar Express JCO 5.2.2022
11003/11004 Dadar- Sawantwadi Road – Dadar Tutari Express JCO 7.2.2022 & 8.2.2022
50103/50104 Diva – Ratnagiri–Diva Passenger JCO 5.2.2022 & 6.2.2022 & 7.2.2022
10106 Sawantwadi – Diva Express JCO 4.2.2022, 5.2.2022, 6.2.2022 & 7.2.2022
10105 Diva-Sawantwadi Express JCO 5.2.2022, 6.2.2022, 7.2.2022 & 8.2.2022

Short Termination of Express trains at PANVEL
11004 Sawantwadi Road – Dadar Tutari Express JCO 3.2.2022, 4.2.2022, 5.2.2022 & 6.2.2022
10104 Madgaon – Mumbai Mandovi Express JCO 5.2.2022, 6.2.2022 & 7.2.2022
10112 Madgaon – Mumbai Kokan Kanya Express JCO 4.2.2022, 5.2.2022 & 6.2.2022
12202 Kochuveli – Lokmanya Tilak Terminus Express JCO 6.2.2022
16346 Thiruvananthapuram Central – LTT Netravati Express JCO 3.2.2022, 4.2.2022, 5.2.2022 & 6.2.2022
12620 Mangluru JN. – LTT Matsyagandha Express JCO 4.2.2022, 5.2.2022 & 6.2.2022

Short Termination of Express train at PUNE 
17032 Hyderabad – Mumbai Express JCO 4.2.2022 & 5.2.2022

Short Origination of Express trains from PANVEL 
11003 Dadar – Sawantwadi Road Tutari Express JCO 5.2.2022 & 6.2.2022
10103 Mumbai – Madgaon Mandovi Express JCO 5.2.2022, 6.2.2022 & 7.2.2022
10111 Mumbai-Madgaon Kokan Kanya Express JCO 5.2.2022, 6.2.2022 & 7.2.2022
12201 Lokmanya Tilak Terminus – Kochuveli Express JCO 7.2.2022
16345 LTT-Thiruvananthapuram Central Netravati Express JCO 5.2.2022, 6.2.2022, 7.2.2022 & 8.2.2022
12619 LTT – Mangluru JN. Matsyagandha Express JCO 5.2.2022, 6.2.2022 & 7.2.2022

Short Origination of Express train from PUNE
12701 Mumbai – Hyderabad Hussain Sagar Express JCO 5.2.2022 & 6.2.2022

MEMU services cancelled on 5.2.2022, 6.2.2022 and 7.2.2022
01338/01337 Dombivali – Boisar – Vasai Road
01339/01340 Vasai – Diva – Vasai Road
01341/01342 Vasai Road – Diva –Vasai Road
01343/01344 Vasai Road – Diva –Vasai Road
01345 Vasai Road – Diva
01357/01358 Vasai Road – Diva –Vasai Road
01347/01348 Diva – Roha – Diva
01349 Diva – Roha
01346 Roha – Diva
01353/01354 Diva – Panvel – Diva
01355/01356 Diva – Pen – Diva
01352/01351 Pen – Diva – Pen

Western Railway MEMU services that WILL RUN on 5.2.2022, 6.2.2022 & 7.2.2022
09284 Dahanu Road – Panvel
09285 Panvel – Vasai Road
09287/09288 Panvel – Vasai Road – Panvel
09286 Vasai Road – Panvel
09281 Panvel – Dahanu road

In addition to Western Railway MEMU services following special MEMU services WILL RUN on 5.2.2022, 6.2.2022 & 7.2.2022

(I) Roha – Panvel – Roha MEMU services
Panvel – Roha Special -1 leaving Panvel at 08.25 hrs and arrive Roha at 10.10 hrs
Roha – Panvel Special -2 leaving Roha at 06.30 hrs and  arrive Panvel at 08.15 hrs
Panvel –Roha special -3 leaving Panvel at 18.05 hrs and arrive Roha at 19.50 hrs
Roha – Panvel Special -4 leaving Roha at 16.15 hrs and  arrive Panvel at 17.55 hrs

(II) Pen – Panvel – Vasai Road MEMU services
Vasai Road – Panvel special-1 leaving Vasai Road at 09.25 hrs and arrive Panvel at 11.10 hrs
Pen- Vasai Road special -2 leaving Pen at 06.35 hrs, Panvel at 07.29 hrs and arrive Vasai Road at 09.15 hrs
Vasai Road – Panvel special-3 leaving Vasai Road at 13.15 hrs and arrive Panvel at 15.00 hrs
Panvel – Vasai Road special -4 leaving Panvel at 11.20 hrs and arrive Vasai Road at 13.05 hrs
Vasai Road – Pen special-5 leaving Vasai Road at 17.50 hrs, at Panvel 19.34 hrs and arrive at Pen at 20.30 hrs
Panvel – Vasai Road special -6 leaving Panvel at 15.10 hrs and arrive Vasai Road at 16.55 hrs

This Infrastructure Block of 72 hours on Thane-Diva Fast line for 5th and 6th line has to be done for major upgrade. Passengers are requested to bear with the Railway Administration for the inconvenience caused due to this infrastructure block.

About Author

error: Content is protected !!

Maintain by Designwell Infotech